Site icon Inside Croydon

Railway lines closed across south London for signalling works

Lines closed: Southern, Thameslink and London Overground services across south London are to be affected by engineering works over the next week

There will be significant disruption to rail services across south London, starting this weekend and continuing through to November 1, for engineering works.

There will be no Southern, Thameslink or London Overground trains in the Peckham Rye, Tulse Hill, Crystal Palace and Tooting areas.

Network Rail is modernising 1980s track and signalling on lines, with work starting on October 26.

“This work will provide a more reliable service with fewer delays,” says Southern.

“A lot of work has already been completed, with most of the new signalling equipment now installed.”

To allow the new signalling to be finished and tested, for the next week, from Saturday October 26 until Friday November 1, the following sections of the rail network will be closed:

Southern

Thameslink

London Overground

“The dates of the closure have been timed to take place at the same time as many schools in the area have their half-term break, when fewer people travel,” Southern says.

“If you use these sections of the network, please plan ahead as you will need to amend your journey during the closure, and journeys will take longer.”


Inside Croydon – If you want real journalism, delivering real news, from a publication that is actually based in the borough, please consider paying for it. Sign up today: click here for more details



Exit mobile version