South Norwood has all the signs of traffic chaos for next month

Essential, and in advance: one of the road closure signs, at the Manor Road junction with Portland Road

By PETER GILLMAN

South Norwood is soon to be hit with traffic chaos again – but neither Croydon Council nor the alternative possible culprits, Thames Water, have been able to provide more information about precisely which roads they intend to close, or when, or for how long.

In the past two weeks a rash of signs warning of closures have appeared around Portland Road and Norwood Junction.

There have been constant holdups the length of Croydon Road and the adjoining streets for the past six months, thanks to Thames Water. But the utilities company has refused to offer any guidance on what its intentions are in respect of any further “essential works” (they are almost always “essential” works, you may have noticed).

The latest signs have been erected in Manor Road, Clifford Road and at the entrance to Albert Road.

Same message, different location: Portland Road, junction with Albert Road. But will it be Albert Road or Portland Road closed at this junction?

The sign on Manor Road, headed “Advance Warning”, says “This road will be closed here 08:00 07/04/2025 to 18/04/2025”.

There is a similar sign in Clifford Road, but with different dates: 24/03/2025 to 18/04/2025. So these essential works start next Monday and are due to last for almost four weeks – twice the time of the Manor Road works.

The problem arises with the sign which is at the entrance of Albert Road from Portland Road, with the dates 24/03/2025 to 18/04/2025. Does it mean that Albert Road will be closed? Or Portland Road?

If Albert Road is to be closed at the same time as Manor Road and Clifford Road, the problems for motorists will be bad enough. But if Portland Road is to be closed as well, all surrounding roads in South Norwood will be gridlocked, bringing massive jams to an area which is constantly plagued with them.

In the spirit of public service journalism, Inside Croydon asked Croydon Council if it could clarify whether Portland Road was to be closed. We asked not once, but four times. Croydon Council’s propaganda department failed to respond.

No through road: it appears there may be problems along Manor Road, close to Goathouse Bridge, too

We also asked how traffic would be redirected and what the “essential works” consisted of, but the answer again was silence.

We also emailed our favourite local traffic disruptor, Thames Water, to ask if they were carrying out the works.

Thames Water, possibly suffering from an overload of attention following the weeks of chaos it caused in Anerley Road, has not answered either.

The only thing that the public can assume with any certainly is that for the next month, traffic in and around Norwood Junction is likely to be a nightmare. You have been warned – just a pity that our local authority and privatised utility companies can’t be bothered to offer any advice in advance.

And on a related point: why do “they” (local authorities and the utilities firms who dig up our roads) always erect signs stating “Advance Warning”? Or sometimes “Advanced Warning”.

What kind of “warning” is it if it is not given in advance?

Recent articles by Peter Gillman:



Inside Croydon – If you want real journalism, delivering real news, from a publication that is actually based in the borough, please consider paying for it. Sign up today: click here for more details


  • If you have a news story about life in or around Croydon, or want to publicise your residents’ association or business, or if you have a local event to promote, please email us with full details at inside.croydon@btinternet.com
  • As featured on Google News Showcase

About insidecroydon

News, views and analysis about the people of Croydon, their lives and political times in the diverse and most-populated borough in London. Based in Croydon and edited by Steven Downes. To contact us, please email inside.croydon@btinternet.com
This entry was posted in Business, Croydon Council, Peter Gillman, South Norwood, Thames Water and tagged , , , , , , , . Bookmark the permalink.

11 Responses to South Norwood has all the signs of traffic chaos for next month

  1. There’s a handy map you can check on the Council website https://www.croydon.gov.uk/parking-streets-and-transport/street-maintenance-repairs-and-improvements/roadworks-and-closures/roadworks

    That Croydon council didn’t consult it or refer you to it shows how either appalling customer service or poor training

    • Jim Bush says:

      But this being Croydon, the roadworks map is not very handy. It covers the whole of London but if you enlarge it a bit you find absolutely nothing at the junction by the low bridge over Portland Road, which is where the warning signs say that disruption is coming next month.
      If you click on one of the places in the area that does have disruption (eg. St James’ Rd (A222) closer to Croydon, it (unhelpfully) says that there will be a public event there btw 14 Sep 2024 and 14 Sep 2030, which is hardly precise dates !?!

      • The map is maintained by Causeway Technologies Ltd.

        If you type in “Portland Road” and select the one that is in SE25 , it will allow you to zoom in and find “the junction by the low bridge over Portland Road”.

        Opt for “Next three months” rather than “Today” and, with a bit of a wiggle, you’ll find information about roadworks in Manor Road from “6 Apr 08:00 – 18 Apr 17:00”.

        The reason? “Kerb, Island and Footway works for Vision safe streets and safe speeds road safety scheme.”

  2. Jim Bush says:

    “What kind of “warning” is it if it is not given in advance?”
    As they often forget to take the signs away when they complete the work, they immediately become “Retro Advance Warning” signs.
    Perhaps they only remove the signs when the works/disruption overruns, so that you can no longer see when they had promised to complete the work ?!

  3. Thomas Windsor says:

    Residents in Albert Road have had a letter and map of the de-improvements. They are moving the pedestrian crossing narrowing roads etc. The letter is from Brian Fitzpatrick at highwayimprovements@croydon.gov.uk I can scan my copy if needed.

  4. Robbie says:

    The roadworks around Clifton Road, Portland Road, Albert Road and Manor Road are to install a speed table, reduce the width of Albert road, shift the Zebra crossing towards the bridge (that’ll annoy the newsagents which is immediately at the end of the current crossing), and plant some trees (to reduce the sight lines to pedestrians crossing the roads from car drivers).

    We’re received a missive from the Croydon propaganda department a couple of weeks ago about this.

  5. Irish Paul London Croydon says:

    Tory mayor out now. Croydon fed up with tory mayor.
    Out out out.

Join the conversation here