New lifts give step-free access for passengers at Sutton Station

Sutton Station’s old and unreliable lifts have been replaced, giving rail passengers step-free access between platforms and the station concourse once again after a four-month engineering project.

Platform access: Artemis O’Dea makes use of the renewed lifts at Sutton Station 

Network Rail finished the lift replacement work in quick order for the busy station which is served by Southern and Thameslink trains. Now wheelchair users, the elderly and parents with children in pushchairs have better access to their transport.

To speed replacement work, engineers for Network Rail worked on all three lifts simultaneously to finish the work in 17 weeks – less than half the time it would have taken if they’d replaced them one by one. The capacity of one of the lifts has also been increased from 16 to 20 people.

Lucy McAuliffe, Network Rail Sussex route director, said: “The existing lifts at Sutton Station had been in use for 24 years and needed replacing to give passengers reliable step-free access to the rail network.

“We knew this was going to be disruptive, particularly to passengers with accessibility needs, but by replacing all three simultaneously, we finished the job much faster.”

Jenny Saunders, customer services director at Govia Thameslink Railway, which manages Sutton Station, said: “Sutton Station is an important interchange, so it’s really good news that Network Rail has finished replacing the ageing lifts that were becoming increasingly unreliable.

“I’d like to thank all our passengers for their patience.”


Inside Croydon – If you want real journalism, delivering real news, from a publication that is actually based in the borough, please consider paying for it. Sign up today: click here for more details


PAID ADS: To advertise your services or products to our 10,000 weekday visitors to the site, as featured on Google News Showcase, email us inside.croydon@btinternet.com for our unbeatable ad rates



  • If you have a news story about life in or around Croydon, or want to publicise your residents’ association or business, or if you have a local event to promote, please email us with full details at inside.croydon@btinternet.com
  • As featured on Google News Showcase

About insidecroydon

News, views and analysis about the people of Croydon, their lives and political times in the diverse and most-populated borough in London. Based in Croydon and edited by Steven Downes. To contact us, please email inside.croydon@btinternet.com
This entry was posted in Commuting, Sutton Council, Transport and tagged , , , , , . Bookmark the permalink.

3 Responses to New lifts give step-free access for passengers at Sutton Station

  1. George Edward Manson says:

    Well done BR – this was needed & other stations need this too.

    • Jim Bush says:

      If BR stands for British Rail(?), George, they ceased to exist in 1997, nearly 30 years ago, or hadn’t you noticed?

      I was pleased to find lifts last month (at the Open House London festival) at both Bromley South and Petts Wood stations. Bromley South’s two lifts were apparently installed about 15 years ago, but they hadn’t been there when I used that station in 2004. Petts Wood has four lifts which looked very new indeed.

  2. Jon Hart says:

    In the email I received from Southern about the lift replacement it said the work would start on 16th June and was expected to take three months.

Join the conversation here