Another shutdown of New Addington trams from Oct 17 to 18

Another week, another notice of more tram closures.

End of the line: New Addington’s tram service will be closed this weekend, as well as for another fortnight into November

The latest disruption was confirmed by Transport for London this morning: no service on the branch between Sandilands and New Addington this coming weekend, October 17 to 18.

“This is so essential engineering works can be carried out to improve the tramway.

“We are sorry for the disruption this may cause.”

This latest closure will also impact residents on Gravel Hill and Addington Village, as well as weekend visitors to Lloyd Park, the Addington Hills and nature reserves such as Hutchinson’s Bank.

There will be no tram replacement buses for this weekend closure. 

Inside Croydon was first to report the upcoming closure for two weeks of half the tram network, from Arena to Beckenham Junction and Elmers End, and to New Addington. These track replacement works are due to start on Saturday October 24 and last for a fortnight, through to Friday November 6.

Local MP Natasha Irons has written to TfL’s tram network manager to complain about the frequent disruptions to the service.

“I recognise the need to maintain our transport infrastructure safely. But residents, understandably, are already frustrated by the frequency and scale of disruption,” Irons, the Labour MP for Croydon East, said in her letter last week.

The further closures this weekend have been announced since Irons’ sent her letter.

TfL’s notice issued today says that during the Sandilands to New Addington closure on October 17-18, “trams will continue to run between Wimbledon and Beckenham Junction/ Elmers End”. All other services through East Croydon and the town centre will be unaffected.

“Normal service is expected to resume at the start of service on Monday October 19,” TfL says.

“Please check before you travel, allow more time for your journey and where possible consider using local buses, walking, or cycling.” TfL’s journey planner can be found by clicking here.

Read more: What it’s really like trying to get to work from New Addington
Read more: Half tram network shut down for another two weeks’ works
Read more: Mayor Khan says he didn’t know Croydon trams need replacing
Read more: TfL report confirms decade delay over Croydon’s new trams


A D V E R T I S E M E N T


Inside Croydon – If you want real journalism, delivering real news, from a publication that is actually based in the borough, please consider paying for it. Sign up today: click here for more details


PAID ADS: To advertise your services or products to our 10,000 weekday visitors to the site, as featured on Google News Showcase, email us inside.croydon@btinternet.com for our unbeatable ad rates


  • If you have a news story about life in or around Croydon, or want to publicise your residents’ association or business, or if you have a local event to promote, please email us with full details at inside.croydon@btinternet.com
  • As featured on Google News Showcase

About insidecroydon

News, views and analysis about the people of Croydon, their lives and political times in the diverse and most-populated borough in London. Based in Croydon and edited by Steven Downes. To contact us, please email inside.croydon@btinternet.com
This entry was posted in Commuting, Croydon East, East Croydon, Natasha Irons, New Addington North, New Addington South, TfL, Tramlink, Transport and tagged , , , , , , , , , , , , , . Bookmark the permalink.

1 Response to Another shutdown of New Addington trams from Oct 17 to 18

  1. Brian Matthews says:

    Have you noticed that every time the tram system is closed down it is an improvement?

Join the conversation here