Kent Gateway and Selsdon roadworks compound tram misery

If you thought things were bad enough with half the tram network already closed for planned works to replace stretches of track, things have got even worse this morning, due to a power failure at Therapia Lane.

End of the line: the tram network has been hit by a power outage at Therapia Lane today

With no services from East Croydon to New Addington, Beckenham Junction and Elmers End until November 6, this morning the only operating tram service was a shuttle between Wimbledon and Therapia Lane.

Or as TfL would put it today: “No service between Therapia Lane and East Croydon due to a local power failure and no service between East Croydon and Beckenham Junction/Elmers End/New Addington due to planned engineering work. Good service on the rest of the line.” So that’s alright then.

“London Underground are accepting tickets via any reasonable route.” With no Tube lines in south London east of Morden or Brixton, what is defined as a “reasonable route” might make for some fascinating route planning.

Not a good picture: the TfL service status for the trams today

And still the insults are piled on to passenger misery, with the closure of the tram route through to New Addington having significant impact at Kent Gateway.

The road by Addington Park from Gravel Hill to Addington Village is blocked for storage of tram track engineering materials. So buses and trams are not serving Addington Village interchange eastbound.

It all means that the tram replacement buses from East Croydon are going the scenic route, via West Wickham and Coney Hall. “Allow extra time for your journey,” is the TfL adage.

Inside Croydon reported earlier this month how Croydon’s trams have become the poor relation of London’s transport under Mayor Sadiq Khan, with under-investment since Boris Johnson was at City Hall causing an increasing number of breakdowns, to rolling stock and to the track network.

Delays and tailbacks are being encountered in a wide area for other works, too.

Foxearth Road in Selsdon is closed near the junction with Littleheath Woods until midnight on November 2 due to water works.

Log jam: road works in and around Selsdon are compounding traffic issues from Kent Gateway

Around the corner, the junction of Queenhill Road and Farley Road will have four-way temporary lights from today until 6pm on October 30 due to UK Power Networks electrical works.

And just to round things off, at Addington Road, adjacent to the Sir Julian Huxley pub, has multi-way traffic lights until October 30 due to UKPN works.

Some residents’ associations in the area might like to task their councillors to find out who at Croydon Council thought that having such extensive road closures in the same area all at the same time was in any way a good idea.

Read more: Passengers suffering as tram closures up by 68% in a year
Read more: Mayor Khan says he didn’t know Croydon trams need replacing
Read more:
Half tram network shut down for another two weeks’ works


A D V E R T I S E M E N T


Inside Croydon – If you want real journalism, delivering real news, from a publication that is actually based in the borough, please consider paying for it. Sign up today: click here for more details


PAID ADS: To advertise your services or products to our 10,000 weekday visitors to the site, as featured on Google News Showcase, email us inside.croydon@btinternet.com for our unbeatable ad rates


  • If you have a news story about life in or around Croydon, or want to publicise your residents’ association or business, or if you have a local event to promote, please email us with full details at inside.croydon@btinternet.com
  • As featured on Google News Showcase

About insidecroydon

News, views and analysis about the people of Croydon, their lives and political times in the diverse and most-populated borough in London. Based in Croydon and edited by Steven Downes. To contact us, please email inside.croydon@btinternet.com
This entry was posted in Addiscombe West, Commuting, East Croydon, New Addington North, New Addington South, TfL, Tramlink, Transport and tagged , , , , , , , , , , , , , , , , , , . Bookmark the permalink.

2 Responses to Kent Gateway and Selsdon roadworks compound tram misery

  1. Diana Pinnell says:

    Addo, Forestdale, Selsdon all facing puzzles. How to get to Bromley or to Sanderstead or to Purley let alone to Croydon? I’m confused despite living in the area for 60 years! Delivery companies have enough difficulty finding my address as it is.

  2. Karthick Ravichander says:

    It’s quite frankly baffling to understand why TfL didn’t do a contraflow system on the stretch of A2022 works are being carried on, given it’s a dual carraigeway. Not to mention the 64 and 130, which are taking the (even longer route) of “Gravel Hill, Coombe Lane, Shirley Hills Road, Upper Shirley Road, Wickham Road, High Street, Glebe Way, Addington Road [and] Kent Gate Way” (scenic indeed!). Might as well walk from Selsdon to New Addington at this point.

Join the conversation here